Economic
- • Market conditions
- • Labor disruptions
Environmental
- • Storm water treatment and/or quantities
- • Changes in permitting
- • Offsite and onsite wetlands
- • Environmental impact statement (EIS)
- • National Environmental Policy Act (NEPA) 404 merger process
Third Party
- • Utility issues
- • Rail lines (regular and light)
Right-of-Way
- Acquisition problems
- Value and impact
WSDOT Management
- WSDOT program management
Geotechnical
- Geotechnical conditions
Design Process
- • Change in seismic criteria
- • Bridge foundations
- • Local arterial improvements and access
- • Inadequate design/design uncertainty for interchanges
- • Traffic demand
Construction
- • Contaminated soil
- • Natural hazards
- • Work window
- • Auxiliary lanes
- • Staging areas
Other Risks
Minor risks
made with love from Appartamenti vacanza a Corralejo - Fuerteventura